The most economical foundation schemes delivering financial savings

Our Vision

SPEEDECK will become the 1st choice design and build Geostructural solution provider for projects in London, Home Counties and the south coast, we will do this by providing safe, innovate, value engineered solutions for new build foundations that are installed faster than any other suitable method on time.

Our pledge is to establish lasting relationships with clients through value added solutions, which exceed their expectations, and gain their trust by putting our clients’ needs first, through 1st class customer service levels and communication.


Features of our Solution

By working with you early’ we produce the most economical foundation schemes that deliver financial savings.

SPEEDECK produce value engineered foundations through the use of our specialist knowledge and experience to identify suitable techniques for your project

SPEEDECK have identified that, through modest investment in appropriate further site testing, greater savings can be generated by gaining further understanding of the in-situ soils.

All our schemes are 100% compliant with Warranty Providers, with whom we work closely, throughout the design development process.


Problems our solution resolves

Complex integration of Sub-contractors:
We offer you a “one stop shop” for the foundation & ground works package therefore reducing your risk and costs of having to manage the integration of specialist sub-contractors.

Rising costs of temporary works:
We optimize a multi-purpose concrete working surface which stays in-situ, replacing the need for installing and removing expensive piling mats.

Increasing costs associated to landfill tax:
The Chancellor of Exchequer is committed to increasing landfill tax year on year to 2020 and possibly beyond. Our SPEEDECK solution requires significantly less soil to be removed off-site, hence the cost of land fill tax is minimised. You save money over traditional foundation solutions.

Programme certainty:
Our foundation solution reduces risk in the ground and is less dependent on the weather. Our solution is simple and therefore ensures more confidence can be placed on construction programme. Our foundation solution has fewer stages and components.

Flexibility:
Below ground obstructions: When our piled raft solution is used, if a pile hits an obstruction below ground, usually we are able to relocate the pile and adjust our design immediately without causing significant delays.

Our system is a cost-effective solution in any of the following scenarios:

Schemes that require the use of piles and/or ground improvement.

Projects undertaken on brownfield sites.

Where soil reports indicate possible heave/shrinkage

Schemes that require excavated footings in excess of 1.8mtrs

Single foundation areas in excess of 150m2

Projects that require a speedy installation


SPEEDECKs 7 Stage process to sustainable solutions:

1. Site Appraisal & Formulation of Concept Design

2. Further Soils Testing, if required

3. Detailed Design

4. Ground Enabling Works

5. Group Improvement/Piling

6. Oversite Construction

7. Project de-brief & client feedback

Our established process enables our business to deliver consistent quality schemes whilst receiving feedback from our clients on ways we can improve our offering and service.