Hooley Lane, Surrey

  • Client
    Armata Homes / Mostrim Groundworks
  • Location
    Hooley Lane Surrey
  • No. of Units
    4 units
  • Residential Properties

Project Overview

Mostrim appointed SPEEDECK Foundations Ltd to deliver the substructure works for four new apartment blocks at Hockley Industrial Estate, Hooley Lane. The development required a robust, warranty-compliant foundation system capable of overcoming variable Made Ground, contamination, and potential heave from shallow clays, all while protecting programme certainty on a constrained brownfield site adjacent to railway infrastructure.

  • 35% concepting
  • 30% detailed design
  • 35% duration on site.
Time Spent Data
Hooley Lane Architect Plan 2
Hooley Lane Architect Drawings
Key Plan Hooley Lane

Concept Design

SPEEDECK proposed a CFA piled raft foundation as the most technically suitable and cost-effective solution for the site’s complex conditions. The design integrated the piling and raft slab within a single substructure package, eliminating multiple trade interfaces and reducing coordination risks. Full heave protection was adopted beneath Blocks 2, 3 and 4, with partial protection beneath Block 1, ensuring long-term performance under variable tree influence zones.

Site Ready at Hooley Lane with SPEEDECK Foundations
Site Ready at Hooley Lane with SPEEDECK Foundations 2
Piling starting at Hooley Lane with SPEEDECK Foundations
On site piling for new homes foundations with SPEEDECK
Completed drainage and services with SPEEDECK Foundations
Laying Heave Protection with SPEEDECK Foundations
Heave protection installation on foundations with SPEEDECK
Installation of heave protection with piled raft foundation with SPEEDECK

Design Engineering

The foundation was designed as a 300 mm reinforced concrete raft, incorporating 225 mm RDS voidformers where required for heave mitigation. Piles were 300 mm diameter CFA, designed to Eurocode and warranty standards, achieving a maximum safe working load of 480 kN with pile lengths ranging from 6.0 m to 17.0 m. The total raft slab area across the four blocks measured 1,657 m², delivering a single, durable substructure system that optimised both material efficiency and long-term stability.

Housing Foundations with SPEEDECK
Housing Foundation construction near trees with SPEEDECK
Drainage in the piled raft foundation with SPEEDECK
Lift pit construction in Foundations with SPEEDECK
Piled raft construction in Surrey for new homes

Construction

SPEEDECK delivered the piling and raft construction as one integrated scope of substructure works, simplifying sequencing and improving safety and quality control. The approach streamlined installation of underslab drainage and services while minimising contaminated soil removal. The resulting substructure handed back to slab level, providing a predictable and level platform ready for superstructure works to progress without delay.

The Hockley Industrial Estate development showcases SPEEDECK’s ability to combine engineering expertise, technical precision, and practical delivery. Through its integrated piled raft system, SPEEDECK provided a warranty-compliant, technically robust, and efficient foundation solution that secured cost certainty, reduced risk, and delivered lasting performance for Armata Homes.