Harrier Lane, Battle: Piled Rafts for 200 Homes on a 40 m Slope

  • Client
    Greymoor Homes
  • Location
    Battle, East Sussex
  • No. of Units
    100 rafts for 200 units
  • Residential Properties

Project Overview

Harrier Lane drops around 40 m from south to north, with Made Ground up to 3.8 m thick, artesian groundwater in places and retaining walls throughout. For Greymoor Homes’ 200-home scheme, SPEEDECK designed and built piled raft foundations to every plot, approximately 11,271 m² across 100 rafts, with slab steps and downstands taking up the level changes.

  • 40% concepting
  • 30% detailed design
  • 30% duration on site.
Time Spent Data
Key plan 1 Harrier Lane Battle
Key plan 2 Harrier Lane Battle
Key plan 3 Harrier Lane Battle

Concept Design

Made Ground up to 3.8 m thick overlies clayey Head deposits and the Ashdown Formation, interbedded clay, sandstone, siltstone and mudstone, with rock from 0.5 m to 4.6 m below ground level. Groundwater was encountered between 1.1 m and 15.0 m, with artesian conditions in places, so the pile design assumed a conservative water level of 0.5 m and ignored the top 3 m of ground for pile capacity, allowing for the Made Ground, potential heave forces and soft, variable soils.

The shallow clays posed a heave risk. Of 67 Atterberg Limit tests, 27 showed clear desiccation and 14 marginal signs, with plasticity ranging from non-plastic to medium volume change potential. Combining this with the tree influence assessment, SPEEDECK specified heave protection only to plots within tree influence, and partial protection where a slab sat only marginally inside it. That left around a third of the plots needing no heave protection at all.

The retaining walls and slope stability were designed by others, and the raft design was coordinated with them.

Harrier Lane Battle Greymoor Homes Concrete Blinding SPEEDECK 2
Harrier Lane, Battle - Greymoor Homes Concrete Blinding SPEEDECK (3)
Harrier Lane, Battle - Greymoor Homes Concrete Blinding SPEEDECK (4)
Harrier Lane, Battle - Greymoor Homes Concrete Blinding SPEEDECK
Harrier Lane Battle Greymoor Homes Piling SPEEDECK
Harrier Lane, Battle - Greymoor Homes Drainage and Services SPEEDECK

Design Engineering

SPEEDECK designed the rafts to LABC Warranty requirements in RC35 concrete, 225mm thick for two-storey homes and 300mm for three-storey, on 300mm diameter piles. A 160mm voidformer was placed beneath the rafts that needed heave protection. Slab steps, downstands and ground beams took up the changes in external level around the plots.

Harrier Lane, Battle - Greymoor Homes curing slab SPEEDECK
Harrier Lane, Battle - Greymoor Homes piled raft construction SPEEDECK (2)
Harrier Lane, Battle - Greymoor Homes piled raft construction SPEEDECK (3)
Harrier Lane, Battle - Greymoor Homes piled raft construction SPEEDECK (4)
Harrier Lane, Battle - Greymoor Homes piled raft construction SPEEDECK (5)
Harrier Lane, Battle - Greymoor Homes piled raft construction SPEEDECK
Harrier Lane, Battle - Greymoor Homes under construction SPEEDECK

Construction

A concrete working surface was laid before piling, which let a lightweight piling rig work without an engineered piling mat. SPEEDECK installed the piles and rafts, together with underslab drainage up to the first manhole on each plot, across three visits phased to suit Greymoor’s build sequence, within a target programme of approximately 44 weeks.

Targeted testing kept heave protection to the plots that needed it, and a pile design that ignored the unreliable upper ground gave every home a consistent foundation, with steps and downstands absorbing a 40 m fall across the site.