The challenges present on this site which led PDR to reach out to SPEEDECK were:
- Potentially inefficient foundation design provided by the consulting engineer, so the client wanted to see if this could be bettered.
- Wanted to explore if it was possible to expedite build times.
- Wanted to limit dig out due to site constraints.