Project Overview

SPEEDECK were engaged to provide a robust and efficient foundation solution for a residential development of nine new homes at Church Road, Steep, near Petersfield. The site is located on land underlain by Gault Clay with Made Ground and topsoil present at shallow depth. The ground investigation confirmed soft to very stiff clay strata extending to significant depth, with potential for shrink–swell behaviour and heave risk due to clay soils and nearby trees.

Given the ground conditions and the risk of movement within the upper soil horizons, traditional shallow foundations were not considered suitable. SPEEDECK therefore developed a piled raft foundation solution designed to provide long-term stability while maintaining programme certainty for the client.

  • 35% concepting
  • 35% detailed design
  • 30% duration on site.
Time Spent Data
Key Plan Church Road Hampshire
Church Road Wilson Designer Homes Project Start 2
Church Road Wilson Designer Homes Project Start 3
Church Road Wilson Designer Homes Project Start 4
Church Road Wilson Designer Homes Project Start

Concept Design

Following a detailed geotechnical review, SPEEDECK recommended a Continuous Flight Auger (CFA) piled raft foundation system across the development. This approach efficiently transfers building loads through the weaker upper clay strata and into deeper competent material.

Due to the presence of high volume change potential clay soils within the upper ground profile, heave protection measures were incorporated into the design. Voidformers were introduced beneath the raft slab to accommodate potential ground movement and reduce the risk of uplift forces acting on the structure. This concept provided a cost-effective and warranty-compliant solution suited to the challenging ground conditions.

Church Road Wilson Designer Homes Piling 2
Church Road Wilson Designer Homes Piling
Church Road Wilson Designer Homes Drainge 2
Church Road Wilson Designer Homes Drainge

Design Engineering

The engineering design was informed by the available ground investigation data and detailed pile design analysis. CFA piles were designed to achieve maximum safe working loads of approximately 310 kN, providing reliable support for the residential structures.

Pile lengths were typically designed in the range of 10.0 m to 12.0 m, allowing loads to be transferred beyond the weaker near-surface clays into more competent strata at depth. The reinforced piled raft slab was designed to integrate seamlessly with the building structure, supporting both internal loadbearing elements and the outer skin of brickwork while maintaining structural efficiency and durability.

Church Road Wilson Designer Homes Concrete pour
Church Road Wilson Designer Homes Construction
Church Road Wilson Designer Homes Raft Construction
GU322DQ001 - Church Road, Steep - Wilson Designer Homes Ltd 8
GU322DQ001 - Church Road, Steep - Wilson Designer Homes Ltd 11
GU322DQ001 - Church Road, Steep - Wilson Designer Homes Ltd 12

Construction

The selected piled raft solution enabled a streamlined construction methodology. CFA piling minimised noise and vibration compared with alternative driven systems, making it particularly suitable for the rural residential setting.

Once piling works were completed, the reinforced raft slab was constructed as part of the substructure works, creating a stable platform for the superstructure. The integration of piling and raft construction simplified site sequencing and supported efficient programme delivery.

The Church Road development demonstrates how SPEEDECK’s integrated design and construction approach can overcome challenging clay ground conditions. By implementing a CFA piled raft foundation with heave protection, the solution mitigates ground movement risk while delivering a technically robust and cost-efficient substructure.

For the client, the outcome is a warranty-compliant foundation system that provides long-term structural performance while supporting predictable construction sequencing and programme certainty for the nine-home residential scheme.

Can’t fault SPEEDECK, all trades, management and engineers were fantastic. Will be using SPEEDECK again.