Project Overview

Mostrim Groundworks Ltd appointed SPEEDECK Foundations Ltd to deliver the substructure works for eight new residential dwellings at Orchard Way, Croydon. The site comprised variable Made Ground and London Clay with zones of desiccation and widespread tree influence, requiring a foundation system capable of addressing potential heave and ground variability. SPEEDECK was tasked with providing a robust, warranty-compliant solution that would ensure long-term performance while protecting cost and programme.

  • 40% concepting
  • 30% detailed design
  • 30% duration on site.
Time Spent Data
Key Plan Orchard Way
Site ready at Orchard Way Croydon (2)
Site ready at Orchard Way Croydon (3)
Site ready at Orchard Way Croydon
Concrete Blinding with Orchard Way (4)
Concrete Blinding with Orchard Way

Concept Design

Following a detailed geotechnical review, SPEEDECK recommended a CFA piled raft solution as the most efficient and technically suitable approach. This design integrated the piling and slab as one substructure package, eliminating multiple trade interfaces and minimising excavation. Heave protection was required across all plots, and 225 mm voidformers were specified to mitigate uplift forces from the clay soils. The result was a streamlined, low-risk solution that supported both programme certainty and construction efficiency.

Concrete Blinding with Orchard Way (2)
Concrete Blinding with Orchard Way (3)
Drainage construction with SPEEDECK in Croydon
Piling in Croydon with SPEEDECK Foundations

Design Engineering

The foundation was designed as a 225 mm reinforced concrete raft supported by 300 mm diameter CFA piles, designed in accordance with Eurocode and warranty standards. Piles achieved a maximum safe working load of 380 kN, with pile lengths ranging from 6.0 m to 9.0 m. The total raft slab area across the development measured 427 m², delivering a single, durable substructure that minimised movement and reduced overall material volumes.

Steel Raft Construction at Orchard Way with SPEEDECK
Piled Raft Construction in Croydon with SPEEDECK
Piled Raft Construction in Croydon with SPEEDECK (4)
Piled Raft Construction in Croydon with SPEEDECK (3)
Piled Raft Construction in Croydon with SPEEDECK (2)
Construction at Orchard Way with SPEEDECK

Construction

SPEEDECK completed all piling and raft construction as one coordinated substructure package, simplifying sequencing and improving quality control. Plots were constructed on an engineered concrete working platform. The works were delivered safely and efficiently within the agreed programme, reducing excavation and spoil disposal volumes on site within the six week construction programme. This approach provided a level, durable platform ready for immediate superstructure works, improving downstream productivity for the client.

The Orchard Way development highlights SPEEDECK’s ability to design and deliver integrated piled raft foundations tailored to complex ground conditions. Through in-house geotechnical and structural design, combined with single-point delivery, SPEEDECK provided a technically robust, warranty-compliant and programme-certain foundation system that reduced risk and ensured long-term stability for the client.