At Hobbs Farm, the initial proposal was to utilise shallow foundations, but due to the collapse of the majority of trenches SPEEDECK were appointed to carry out the foundation design to the remaining plots.
Unusually for SPEEDECK, engineered piling matts were utilised as the ground has been previously reduced to 300mm beyond our formation level to cater for the initial proposal of strip foundations.