The client required a value engineered foundation solution to overcome the challenging ground conditions on site, the compliant design was found to be unfeasible and as such SPEEDECK needed to intervene in a timely manner in order to meet the clients programme dates.
Our design team offered a cost effective solution and a quick turnaround, whilst also offering solutions to reduce cost and time on site in relation to the depth of drainage. SPEEDECK Offered circa 30% savings vs the clients budget.